This website uses cookies to enhance the experience for you as a visitor. Read more

E4 The Stockholm bypass

Bravida is working on two installation contracts for the Swedish Transport Administration’s E4 The Stockholm bypass Project.

E4 The Stockholm Bypass is a stretch of motorway that is being built to the west of central Stockholm; it will be 21 kilometres long and located down to 70 metres under the ground, with 18 kilometres of it running through tunnels.

Construction of the road began in 2015, under the control of the Swedish Transport Administration, and it is scheduled to open to traffic in 2030. The project comprises a total of around twenty works contracts, five of which are contracts for the installation of technical systems.

Bravida is working on two of the installation contracts: FSE902 and FSE905, and our production start is scheduled for 2022.

E4 The Stockholm bypass Project in brief

Length: 21 km
Lenght of tunnels: 18 km
Number of lanes: 3 in each direction
Number of traffic interchanges: 6
Maximum speed: 80-100 km/h
Travel time: about 15 minutes
Construction period: open to traffic in 2030

More information about the entire project is available on the Swedish Transport Administration’s website

Image gallery