From design to production
Planning and Design for the Stockholm Bypass has been ongoing since 2019. Site mobilization occured in the summer of 2023, and the road is scheduled to open to traffic in 2030.
PMO is responsible for the design and testing of the technical equipment, and installations are carried out by five different Bravida departments: Electrics, Ventilation, Cooling, Sprinkler and VS.
In total, Bravida has about 300 people working on the E4 Stockholm Bypass. Right now, we have construction sites in Kungens Kurva and Lunda.
Read more about the different phases of construction at trafikverket.se