E4 The Stockholm bypass

We are engaged in two contracts on E4 The Stockholm bypass Project for the Swedish Transport Administration.

E4 The Stockholm Bypass is a stretch of motorway that is being built to the west of central Stockholm; it will be 21 kilometres long and located down to 70 metres under the ground, with 18 kilometres of it running through tunnels.

Construction on the road began in 2015, and it is scheduled to open to traffic in 2030. The project comprises a total of around twenty works contracts, five of which are contracts for the installation of technical systems. All works are carried out under the control of the Swedish Transport Administration.

Bravida is engaged in two of the installation contracts: FSE902 and FSE905.

E4 The Stockholm bypass Project in brief

Length: 21 km
Lenght of tunnels: 18 km
Number of lanes: 3 in each direction
Number of traffic interchanges: 6
Maximum speed: 80-100 km/h
Travel time: about 15 minutes
Construction period: open to traffic in 2030

More information about the project is available on the Swedish Transport Administration’s website

About Bravida's deliverables
Construction site
Contact

E4 The Stockholm bypass in pictures