Sustainable swimming and leisure centre in Enköping

Bravida was responsible for installing electrical, ventilation, heating, and plumbing systems in Enköping’s new swimming and leisure centre, Pepparrotsbadet.

imageq25w4.png

The project has a strong emphasis on sustainability and Bravida was responsible for installing the centre’s electrical, ventilation and heating, and plumbing systems.

Project manager Henrik Wall explains Bravida’s involvement.

“We’re doing a lot of work relating to recycling energy. For instance, a lot of waste heat is generated from cooling systems in the gym, the office and the adjacent ice rink. We’re ensuring that waste heat is used to heat the water in the swimming pool.” 

The project was completed in March 2021. 

Contact us

How can we help you? Call your local Bravida office to find out. No assignment is too small or too large.